DuctinDirect Logo

DuctinDirect

Your Basket

No items in cart
Basket Total £0.00 Shipping calculated at checkout
View Basket
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • Shop Pay
  • Union Pay
  • Visa
Please note, some orders may contain items with differing lead times, therefore multiple deliveries may be required.
DuctinDirect Logo
Our products
Ducting & Fittings
Ducting Accessories
Flexible Ducting
Rectangular Ductwork
Fire Protection
Quick-Fit Clip Ducting
Flat-Oval Ductwork
Plastic Ducting
Gasket Fittings
Fans & Accessories
Grilles & Louvres
Kitchen Extract

HMP, Birmingham

Oct 21, 2023 | Case Studies

HMP Birmingham, a category B men’s prison located in the Winson Green area of Birmingham, England, required new ductwork installation throughout the facility. The primary focus of this project was on ensuring the highest levels of security, as breaches could lead to contraband smuggling or escape attempts. Our company was entrusted with the responsibility of executing this project, which involved close collaboration with the prison staff and meeting stringent security standards.

Two significant challenges presented themselves during this project. First, the ductwork had to meet the highest security standards to prevent any possible breaches that might allow contraband or escape attempts. Second, the installation needed to be completed while the prison remained fully operational, which necessitated careful coordination with the prison staff to minimise disruptions to daily activities.

To overcome these challenges, our team collaborated closely with HMP Birmingham staff to develop a detailed plan for the ductwork installation. The plan ensured minimal disruptions to daily operations and focused on maximising security. We chose materials resistant to tampering and designed the ductwork to prevent potential breaches. Our team’s flexibility and adaptability allowed for seamless coordination with the prison staff throughout the project.

The ductwork installation project at HMP Birmingham was successfully completed on time and within budget, with no disruptions to the daily operations of the prison. The new ductwork met all security standards and has effectively prevented breaches. As an added benefit, the prison staff reported improved air quality and reduced noise levels within the facility.

This successful outcome has led to our company being contracted by another prison and secure facility for similar projects. We have showcased our expertise in executing high-security projects while maintaining a focus on quality and efficiency. This case study highlights our commitment to delivering exceptional results, even in challenging environments, and demonstrates our capacity to work with diverse clients and industries.

HMP, Birmingham
Share

Further Reading

  • Frameless, Marble Arch

    Jan 31, 2024 | Case Studies

    Frameless, Marble Arch

  • NHS Hospitals, Various Locations

    Jan 21, 2024 | Case Studies

    NHS Hospitals, Various Locations

  • Steris, Daventry

    Jan 11, 2024 | Case Studies

    Steris, Daventry

  • Contact-Us
    Loading...