DuctinDirect Logo

DuctinDirect

Your Basket

No items in cart
Basket Total £0.00 Shipping calculated at checkout
View Basket
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Maestro
  • Mastercard
  • Shop Pay
  • Union Pay
  • Visa
Please note, some orders may contain items with differing lead times, therefore multiple deliveries may be required.
DuctinDirect Logo
Our products
Ducting & Fittings
Ducting Accessories
Flexible Ducting
Rectangular Ductwork
Fire Protection
Quick-Fit Clip Ducting
Flat-Oval Ductwork
Plastic Ducting
Gasket Fittings
Fans & Accessories
Grilles & Louvres
Kitchen Extract

BIMM Institute, Birmingham

Nov 30, 2023 | Case Studies

The BIMM Institute, a leading educational institution in the music industry, offers students practical, hands-on experience in their field. With eight colleges under its umbrella, BIMM prides itself on providing a creative and stimulating learning environment for its students. In this case study, we focus on the challenges faced by BIMM Birmingham during the design and installation of ductwork to manage airflow while preserving the acoustic quality of the building.

One of the primary challenges for BIMM Birmingham was to design and install ductwork that could efficiently manage airflow without introducing unwanted noise that could potentially disrupt students and faculty or degrade the building’s acoustics. This required a solution that could effectively decrease noise transmission through the ductwork while maintaining a conducive learning environment.

Our company was brought on board to design and install the ductwork system for BIMM Birmingham. After careful analysis of the building and its unique requirements, we proposed the use of attenuators as a solution to the noise problem. Attenuators are devices specifically designed to reduce the noise transmitted through ductwork by absorbing or deflecting sound waves. This results in a significant reduction in the overall noise level within the building.

To achieve the desired noise reduction, we selected attenuators made from a combination of materials with excellent acoustic properties, such as mineral wool, fiberglass, and metal. The choice of materials was determined by the specific application and the level of noise reduction required for BIMM Birmingham.

By implementing our proposed solution, we successfully improved the overall acoustics of the building, leading to a better learning experience for students at BIMM Birmingham. The attenuators reduced the transmission of unwanted noise between different areas of the building, allowing faculty and staff to work in a more enjoyable and productive environment.

In addition, the ductwork system managed airflow effectively, ensuring a comfortable atmosphere for students and staff throughout the building.

Our tailored ducting system, including the use of attenuators, met the specific needs of BIMM Institute and provided effective noise reduction through the appropriate selection of materials. As a result, the acoustics of the building were enhanced, creating a more favourable learning environment for students at BIMM Birmingham. This case study showcases our ability to address unique challenges and deliver effective solutions to enhance the overall experience in educational institutions.

Share

Further Reading

  • Frameless, Marble Arch

    Jan 31, 2024 | Case Studies

    Frameless, Marble Arch

  • NHS Hospitals, Various Locations

    Jan 21, 2024 | Case Studies

    NHS Hospitals, Various Locations

  • Steris, Daventry

    Jan 11, 2024 | Case Studies

    Steris, Daventry

  • Contact-Us
    Loading...